The Haihong Roof Mounting System has become the preferred choice in the field of solar installation due to its excellent performance and reliability. A scientific and standardized installation process is crucial to unleashing its full potential. The following are the detailed installation steps.
Pre – installation preparation serves as the foundation. First, meticulously inventory all system components, ensuring that there is no shortage of brackets, connecting pieces, bolts, nuts, etc. Meanwhile, prepare tools such as electric screwdrivers, wrenches, and spirit levels. Secondly, conduct a comprehensive inspection of the roof. Confirm that the roof structure can bear the weight of the system and the load during operation. Repair cracks and uneven areas; if it is a metal roof, thoroughly clean oil stains and rust to ensure that the installation surface is clean and has good adhesion.
Positioning and layout laying lay the groundwork for precise installation. Based on the layout design of solar panels, use professional instruments such as theodolites and levels to accurately mark the installation positions of the brackets on the roof. Strictly control the errors in levelness and verticality to ensure that the system is installed neatly and standardized, enabling the solar panels to receive sunlight at the optimal angle.
Bracket installation is the core of system stability. The Haihong system offers different adaptations for various roof types. When installing the FixGrid 2018 system on flat roofs, place the base plates at the marked positions, firmly connect them using embedded bolts or special adhesives, and calibrate the level with a spirit level. For pitched roofs using the Proline system, first, quickly assemble the main frame using its modular design, and then closely connect it to the roof structure to ensure a proper fit with the roof slope. Subsequently, on flat roofs, connect the vertical and horizontal rods to form a grid; on pitched roofs, assemble components according to the roof and panel dimensions. Tighten all connection parts with bolts and nuts of the specified specifications according to the standard torque to prevent loosening.
Solar panel installation is related to power generation efficiency. When handling the panels, be careful to avoid collisions and scratches. Place the panels on the brackets in the planned order and align them with the positioning marks. Fix the panels with matching clamps or pressure blocks, keep the panel surfaces flat, and check the uniformity of the gaps between panels. After fixing, correctly connect the electrical circuits to ensure that the connections are firm and well – insulated.
System debugging and inspection ensure safety and efficiency. Use professional equipment to test electrical parameters such as open – circuit voltage and short – circuit current to ensure compliance with standards. Check the stability of the brackets and solar panels, tighten loose bolts and nuts, inspect the roof for any damage, and eliminate potential safety hazards. This guarantees the stable operation of the Haihong Roof Mounting System and enables efficient solar energy conversion.